First, the selection of the converter installation environment:


1. The relative humidity of the air should not exceed 85%;


2. The ambient temperature must be between -10°C and 45°C;


3. The installation site should not experience strong vibrations;


4. It is recommended to install the converter indoors. If outdoor installation is necessary, protective measures against sunlight and rain must be in place;


5. The surrounding air should not contain corrosive gases or harmful substances.



Second, the selection of the sensor installation environment:


1. The sensor should be placed in a dry and well-ventilated area, avoiding moisture, water, flooding, direct sunlight, and rain;


2. Avoid installing the sensor in areas with excessively high ambient temperatures, as this can affect the performance of internal electronic components;


3. Ensure that there are no strong vibrations on the pipes or floors where the sensor is mounted, especially for integrated instruments;


4. Avoid locations where there is a risk of leakage currents on the pipeline. Keep the sensor away from equipment that generates strong electromagnetic fields, such as large motors or transformers, to prevent interference;


5. The installation location should provide enough space for maintenance and operation by personnel.



Third, installation notes:


1. When measuring solid-liquid two-phase fluids, it's best to install the flowmeter vertically, with the fluid flowing from bottom to top;


2. The electromagnetic flowmeter can be installed horizontally, vertically, or at an angle, without strict directional restrictions;


3. Avoid installing the flowmeter at the highest point or top of the piping system;


4. For horizontal installations, ensure that the electrode axis is parallel to the ground, not perpendicular;


5. There should be sufficient space around the flowmeter for installation and future maintenance;


6. The flowmeter should be installed away from points where different conductive media mix, to avoid measurement errors;


7. If the pipe experiences vibration, support brackets should be installed on both sides of the flowmeter to stabilize it.



Jiangsu Zhixing Measurement & Control Instrument Co., Ltd. has always adhered to the principle of honesty and integrity, building long-term, stable, and friendly cooperative relationships with many manufacturers. Our commitment to quality and customer satisfaction ensures that we remain a trusted partner in the industry.

USB Fast Charger Data Cables

Usb Fast Charger Data Cables,Usb Charger Data Cable,New Braided Phone Charging Cable,Iphone Data Cable

ShenZhen Puchen Electronics Co., Ltd. , https://www.szpuchen.com

This entry was posted in on