The basic power supply and distribution system for a construction site electrical project should be designed in three levels, commonly referred to as the three-level power distribution system. This approach ensures that electricity is delivered from the main power source to the end equipment through a structured and hierarchical setup. The system typically starts at the power distribution cabinet or room, then passes through a secondary distribution box (also known as a sub-panel) and finally reaches the switch box (the third level), which connects directly to the electrical equipment. This three-tiered distribution method is essential for maintaining safety, efficiency, and control over the site’s electrical system.
The three-level power distribution system is designed with a clear structure. At the first level, the main distribution panel receives power from the utility source or generator. From there, it branches out to secondary distribution panels, which further distribute power to individual switch boxes. Each switch box is responsible for controlling a specific piece of equipment or a small group of devices. This hierarchical design allows for better management of electrical loads and easier troubleshooting when issues arise.
One of the key principles behind the three-level system is the concept of hierarchical branching. This means that each level of distribution should only feed into the next lower level without any direct connections between non-adjacent levels. For example, the main distribution panel can supply power to multiple secondary panels, and each secondary panel can serve several switch boxes. However, no secondary panel should connect directly to a switch box that is not part of its designated branch. This helps prevent overloading and ensures proper circuit isolation.
Another important principle is the separation of portable and fixed equipment. Portable tools and devices should have their own dedicated circuits to avoid interference and ensure safe operation. Additionally, the system must be designed to minimize the distance between power sources and equipment, reducing voltage drop and improving efficiency. Lastly, the layout should take into account environmental factors such as moisture, temperature, and physical damage, ensuring that all electrical components are properly protected and accessible for maintenance.
JDC Series - Charging Post Power Module Connector
These products are used in intelligent high-frequency switching power supplies, large-scale networks, computer communication power supplies, electric supplies, railway power supplies, and large-scale LED power supplies. Uninterruptible power supply(UPS) and so on
jdc series,power module connector,charging post,fast charge,reliable
Huizhou Fibercan Industrial Co.Ltd , https://www.fibercan-network.com