(Part 2 of the Bidding) Preliminary Announcement of Bidding for Fujian Datang International New Energy Co., Ltd. (2017-2019)

(Part 2 of the Bidding) Preliminary Announcement of Bidding for Fujian Datang International New Energy Co., Ltd. (2017-2019)

Pursuant to the "Law of the People's Republic of China on Tendering and Bidding" and relevant laws and regulations, and following the principles of openness, fairness, impartiality, and good faith, commissioned by Fujian Datang International New Energy Co., Ltd., to pretest the annual data of Fujian Datang International New Energy Co., Ltd. Domestic open bidding is welcome, and interested manufacturers are welcome to register.

I. Project overview and scope of tender

Project Name: Fujian Datang International New Energy Co., Ltd. Annual Pretest

Project Overview: Fujian New Energy Corporation was established in July 2009 and is a wholly-owned subsidiary of Datang International. The wind farms that have been completed and put into operation are Luzhou Liujing, Changle Wushan and Zhaoan Meiling. The total installed capacity is 177,600 kilowatts. The Liuzhou Liuyi Wind Farm (Zhangzhou Wind Power Company) has an installed capacity of 101,600 kilowatts, which is divided into three phases of construction and a total of 85 wind turbines, of which 36 were used in the first phase of the GAMEGA G52-850 fan, and the second phase was 36 Susland. S64-1250 wind turbines, Phase III 13 Xiangjiang Z72-2000 fans; Changle Wushan Wind Power Plant installed 28,000 kilowatts, a total of 14 Xiangdian Z82-2000 fans; Zhaoan Meiling Wind Power installed capacity 48,000 kilowatts, a total of 24 Taiwan Z82-2000 fan. Each of the three wind power farm substations needs annual pre-testing and regular maintenance to ensure the safe and stable operation of the equipment. The bidding is for the annual pre-trial and regular maintenance of the three wind farms during the period from January 1, 2017 to December 31, 2019. The scope of the tender: 1. The annual pre-test maintenance of Liuyi Wind Farm, and the scope of equipment used for routine maintenance throughout the year: 1,110kV equipment: two 110kV outlet intervals, three main transformers and one bus PT compartment, GIS equipment and each Space and secondary equipment and accessories; 2,35kV equipment: Line spacing of 5 cable overhead line combinations (including 49 box transformers and load switches), 35kV lines, 2 grounding transformers, 2 sets of capacitors, 2 sets of SVG, 35kV busbars, 2 PT cabinets, 1 set of field transformers, 1 busbar bay, 2 main transformers, low-voltage side bay secondary equipment and accessories. 3, 10kV equipment: 6 cable outlets (including 6 ring network cabinets, 36 box transformers, buried cables), 1 grounding transformer, 1 set of field transformers, 1 set of SVG, 10kV busbar, 1 PT cabinet Interval, primary and secondary low-pressure side interval secondary equipment and accessories. 4, station communications equipment, DC systems, UPS systems, measurement equipment, grounding networks, integrated automation and other related equipment. 5, substation area production and living lighting maintenance. 6. Wind measuring tower: partial anti-corrosion treatment of iron towers, battery maintenance and testing; II. The annual pre-test and maintenance of Wushan Wind Farm, and the equipments for the whole year's routine maintenance and repairs. 1, 110kV equipment: 1 interval of 110kV outlets, 1 set Main transformer and 1 PT interval (line change group), GIS equipment and first and second interval equipment and accessories; 2 35kV equipment: 1 ground change, 2 sets of capacitors, 1 reactor, 1 rectification, 1 PT cabinet, 1 set of secondary equipment and accessories for variable-interval, main transformer low-voltage side interval; 2 field 35kV overhead line switch protection (including 14 box variants and load switches), etc. Secondary equipment and accessories. 3, station communication equipment, DC system, UPS system, measurement equipment, grounding network, integrated automation and related equipment. 4, substation area production and living lighting maintenance. 5. Wind measuring tower: partial anti-corrosion treatment of iron towers, battery maintenance and testing; III. Annual pre-test and maintenance of Meiling wind farm, and equipment maintenance for the whole year's routine maintenance. Range of equipment: 1,110kV equipment: 1 interval of 110kV outgoing line, 1 set Main transformer and 1 PT interval (line change group), GIS equipment and first and second interval equipment and accessories; 2 35kV equipment: 1 ground change, 2 capacitors, 1 reactor, 1 PT cabinet, 1 set of secondary and secondary equipment and accessories for variable interval, main transformer low-voltage side interval; 4 back 35kV overhead line field switch protection (including 24 sets of box transformers and load switches) and other secondary equipment and accessories. 3, station communication equipment, DC system, UPS system, measurement equipment, grounding network, integrated automation and related equipment. 4, substation area production and living lighting maintenance. 5. Wind measuring tower: partial anti-corrosion treatment of the iron tower, battery maintenance and testing; For details, please refer to the relevant provisions of the tender document technical specifications. Third, bidder qualification requirements

3.1 Must be registered in the People's Republic of China and have independent legal personality, with the power to independently conclude and perform the contract.

3.2 has a valid tax registration certificate and organization code certificate.

3.3 Qualification requirements for bidders:

3.3.1 It shall have a permit issued by the National Commission for the Acquisition of Procurement of Qualified and Validated Class III or above for the installation, commissioning, and acceptance of mining and recruitment facilities.

3.3.2 It has the qualifications and above for professional contractor for power transmission and transformation engineering.

3.3.3 Must comply with national laws and regulations, have good reputation, business ethics and after-sales service capabilities, and no major economic disputes.

3.3.4 Performance requirements: The performance of two or more similar projects must be available in the past five years to provide construction resumes and safety construction records for the past five years.

3.3.5 Consortium bid: Consortium bids are not accepted.

3.4 Has good bank credit and business reputation, is not being ordered to suspend business or bankruptcy, and assets have not been reorganized, taken over and frozen. Must provide good financial statements (balance sheet, profit and loss statement and cash flow statement) audited by professional auditing companies or governments in the past three years and valid credit certificates provided by banks.

3.5 The bidder must have terminated the contract in the past 3 years without having breached the contract or been subcontracted by any of the contracts; the bidder did not show any technical, quality, business, etc. during the construction of the project undertaken in the past. Legal disputes; bidders have no major project quality and safety accidents in the past three years.

3.6 During the construction of the engineering projects undertaken by the China Datang Corporation in the past, there were no technical, quality or commercial disputes involving the main responsibility of the bidders.

IV. Acquisition of Bidding Documents

4.1 Ways to Obtain Bidding Documents: Log in, apply for the bidding document with the company's CA certificate electronic key and follow-up bids.

4.2 Bidding documents are available from November 15, 2016 to November 25, 2016.

2) The result of the purchase is subject to the platform.

4.3 After the tender has adopted the post-qualification method, the bid evaluation committee will review the qualifications of the bidders after the bid opening. The bids of bidders whose qualifications do not meet the requirements specified in the bidding documents will be treated as rejected bids.

Fifth, the submission of tender documents

5.1 Deadline for submission of tender documents (Bid deadline, the same below): 10:00 am on December 6, 2016 (if there is any change, we will notify you separately).

5.2 Place of delivery: Beijing (tentative)

5.3 Ways of submission: Prior to the deadline for submitting tender documents, all potential bidders submitted paper tender documents and their electronic versions in accordance with the requirements of the tender documents, and completed the work of uploading the electronic bidding documents of the platform. If the documents are delivered late or not delivered to the designated place or are not sealed as required, the tenderee will not accept it.

5.4 Other submission methods and issues requiring attention: The electronic version of the bidding documents needs to be submitted on the platform, and the electronic bid opening and evaluation shall be implemented. The bidders shall not open or bid on the written tender documents, but only use them for archiving.

The opening of the bid is subject to the electronic bid opening method. For bidders who are not familiar with the online bidding operation, we will hold a training conference.

Contact: Qian Yong

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.

Apple Headset Wireless Charger

Qi Certified Charger,Apple Wireless Charger,Apple Watch And Phone Charger,Apple Headset Wireless Charger

wzc , https://www.dg-wzc.com

This entry was posted in on